side-area-logo

Detailed design “Glinište”

Description

DETAILED DESIGN "GLINIŠTE"

The section of the highway E-75-LOT 6, locality “Glinište“, construction of the constructive embankment instead of the viaduct, on chainage from km 898+625.00 to 898+825.00. According to the technical documentation, the viaduct is located on the highway E-75 Lot 6, locality "Glinište", on the chainage from km 898+625.00 to km 898+825.00. Its purpose is to prevent the entry of torrential deposits on the highway construction. Due to the specific geomorphological setting, on the right axis of the highway, backfilling was performed, along with construction of the embankment system, the one that represents the substitute for previously planned viaduct.

Info
Recommend
  • Facebook
  • Twitter
  • Google +
  • LinkedIN
Share
Tagged in