Gas distribution networks

Preparation of technical documentation for natural gas transport and distribution through a pipeline of up to 70 bar pressure

SERVICES

Gasification sector is engaged in following activities:

Preparation of technical documentation for:

  • Transmission gas pipelines over 16 bar;
  • Distribution gas pipelines up to 16 bar;
  • Distribution gas networks up to 4 bar for settlements;
  • Gas installations for industrial facilities
  • Gas installations for hotel and communal facilities
  • Metering and regulating stations 50/16 bar, 16/4 bar, 4/1 bar.

Types of projects:

  • New constructions;
  • Reconstruction and extensions.

Preparation of fire protection projects for facilities threatened by fire;

Consulting services;

Provision of expert supervision services.

Stages of technical documentation:

  • General design;
  • Conceptual design;
  • Design for building permit;
  • Construction design;
  • As-built design.
FOCUS

In terms of the listed activities we pay special attention to:

  • Analysis of issues regarding safe transmission and distribution of natural gas and preparation of technical solutions for improvement of concrete safety measures
  • Involvement of local community in designing and planning process
  • Sustainability of design solutions
  • Maintaining and improving the quality of living environment
  • Integration of gas pipeline systems to natural and urban environment.

Pipeline Design

Projects

REFERENCES

_______________________________________________________________________________

MERIDIJANPROJEKT
SURVEYING AND ROAD CONSTRUCTION – Novi Sad branch
GASIFICATION SECTOR

Jovana Đordjevica br.2, 21 000 Novi Sad, Serbia

Phone: 021 2700-890; 021 2700-899
021 5575-70
E-mail:office@meridijanprojekt.com

Working hours:
Weekdays: 08:00-16:00h
Saturday: Closed

Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L= 1.500 km

2015-

Braničevo District, Republic of Serbia

Gas Invest AD Beograd

Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L= 450 km

2014-

Kruševac Town, Republic of Serbia

Rasina Energogas Kruševac

Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L= 150 km

2012-2013

Municipality of Opovo, Republic of Serbia

Promont Group Novi Sad

Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L= 235 km

2012-2013

Municipality of Bela Crkva, Republic of Serbia

Promont Group Novi Sad

Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L=625 km

2013-2014

Sombor Town, Republic of Serbia

Bobar DOO Beška

Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L=360 km

2012-2013

Municipality of Šid, Republic of Serbia

Gap Generali Appal Ti Publici Novi Sad