Preparation of technical documentation for natural gas transport and distribution through a pipeline of up to 70 bar pressure
SERVICES
Gasification sector is engaged in following activities:
Preparation of technical documentation for:
- Transmission gas pipelines over 16 bar;
- Distribution gas pipelines up to 16 bar;
- Distribution gas networks up to 4 bar for settlements;
- Gas installations for industrial facilities
- Gas installations for hotel and communal facilities
- Metering and regulating stations 50/16 bar, 16/4 bar, 4/1 bar.
Types of projects:
- New constructions;
- Reconstruction and extensions.
Preparation of fire protection projects for facilities threatened by fire;
Consulting services;
Provision of expert supervision services.
Stages of technical documentation:
- General design;
- Conceptual design;
- Design for building permit;
- Construction design;
- As-built design.
FOCUS
In terms of the listed activities we pay special attention to:
- Analysis of issues regarding safe transmission and distribution of natural gas and preparation of technical solutions for improvement of concrete safety measures
- Involvement of local community in designing and planning process
- Sustainability of design solutions
- Maintaining and improving the quality of living environment
- Integration of gas pipeline systems to natural and urban environment.
REFERENCES
_______________________________________________________________________________
MERIDIJANPROJEKT
SURVEYING AND ROAD CONSTRUCTION – Novi Sad branch
GASIFICATION SECTOR
Jovana Đordjevica br.2, 21 000 Novi Sad, Serbia
Phone: 021 2700-890; 021 2700-899
021 5575-70
E-mail:office@meridijanprojekt.com
Working hours:
Weekdays: 08:00-16:00h
Saturday: Closed
Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L= 1.500 km
2015-
Braničevo District, Republic of Serbia
Gas Invest AD Beograd
Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L= 450 km
2014-
Kruševac Town, Republic of Serbia
Rasina Energogas Kruševac
Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L= 150 km
2012-2013
Municipality of Opovo, Republic of Serbia
Promont Group Novi Sad
Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L= 235 km
2012-2013
Municipality of Bela Crkva, Republic of Serbia
Promont Group Novi Sad
Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L=625 km
2013-2014
Sombor Town, Republic of Serbia
Bobar DOO Beška
Development of project documentation for the construction of low pressure and medium pressure pipeline with the accompanying facilities L=360 km
2012-2013
Municipality of Šid, Republic of Serbia
Gap Generali Appal Ti Publici Novi Sad